The Complete Home Renovation Checklist for Rochester, NY Homeowners

Starting a home renovation in Monroe County? This step-by-step checklist covers everything from initial planning through final walkthrough. Bookmark this page — you’ll reference it throughout your entire project.

This checklist is based on 16+ years of residential remodeling experience across Pittsford, Penfield, Brighton, Webster, Fairport, Victor, Mendon, Irondequoit, and Henrietta.

Phase 1: Planning (8-12 Weeks Before Construction)

Budget & Financing

  • ☐ Determine total renovation budget (include 10-15% contingency for surprises)
  • ☐ Research financing options: home equity loan, HELOC, personal savings, or FHA 203(k) rehab loan
  • ☐ Get pre-approved for financing if needed
  • ☐ Create a spreadsheet tracking all costs (materials, labor, permits, fixtures, appliances)

Design & Scope

  • ☐ Define the scope of work — what rooms and what changes?
  • ☐ Collect inspiration photos (Houzz, Pinterest, Instagram)
  • ☐ Decide on must-haves vs. nice-to-haves
  • ☐ Measure all rooms being renovated
  • ☐ Consider aging-in-place features if you plan to stay long-term
  • ☐ Think about how you’ll live during construction (temporary kitchen setup, etc.)

Finding a Contractor

  • ☐ Get referrals from friends, family, neighbors, and local community groups
  • ☐ Check online reviews (Google, Houzz, BBB)
  • ☐ Verify the contractor carries general liability insurance AND workers’ compensation
  • ☐ Ask for references and actually call them
  • ☐ Get at least 2-3 detailed written estimates (not just ballpark numbers)
  • ☐ Ask about their project management process — who is your daily contact?
  • ☐ Ask about warranty — what’s covered and for how long?
  • ☐ Verify they pull their own permits (never hire a contractor who asks YOU to pull the permit)
  • ☐ Check if they use subcontractors or in-house crews

Important Note for New York State

New York State does not have a statewide contractor licensing requirement. This means anyone can call themselves a contractor. That makes checking insurance, references, and track record even more critical. Always verify general liability and workers’ comp certificates directly with the insurance company.

Phase 2: Pre-Construction (4-8 Weeks Before)

Contracts & Permits

  • ☐ Sign a detailed written contract that includes:
    • Scope of work with specifications
    • Total cost with payment schedule
    • Estimated start and completion dates
    • Change order process
    • Warranty terms
    • Insurance certificates
  • ☐ Obtain building permits from your town’s building department:
    • Pittsford: (585) 248-6225
    • Penfield: (585) 340-8630
    • Brighton: (585) 784-5220
    • Webster: (585) 872-7068
    • Fairport/Perinton: (585) 223-0770
    • Victor: (585) 742-5030
    • Mendon: (585) 624-6064
    • Irondequoit: (585) 336-6060
    • Henrietta: (585) 334-7700
  • ☐ Check if your neighborhood has an HOA with renovation restrictions
  • ☐ Notify your homeowner’s insurance company about the renovation

Material Selections

  • ☐ Select and order cabinetry (6-10 week lead time for custom)
  • ☐ Select countertop material and schedule template/fabrication
  • ☐ Choose tile for floors, backsplash, shower
  • ☐ Select plumbing fixtures (faucets, sinks, toilets, showerheads)
  • ☐ Choose lighting fixtures
  • ☐ Select hardware (knobs, pulls, hinges)
  • ☐ Choose paint colors
  • ☐ Order appliances if applicable (check delivery lead times)

Prepare Your Home

  • ☐ Clear the work area completely — remove furniture, decorations, personal items
  • ☐ Set up a temporary kitchen if your kitchen is being remodeled (microwave, mini-fridge, coffee maker in another room)
  • ☐ Protect adjacent rooms with plastic sheeting and drop cloths
  • ☐ Create a clear path for workers to enter/exit without going through your living space
  • ☐ Discuss parking and dumpster placement with your contractor
  • ☐ Inform neighbors about the upcoming construction
  • ☐ Make arrangements for pets during noisy/dusty work
  • ☐ Identify your main water shutoff and electrical panel

Phase 3: During Construction

Weekly Check-Ins

  • ☐ Schedule regular progress meetings with your project manager
  • ☐ Review work completed vs. timeline
  • ☐ Address any concerns immediately — don’t let issues build up
  • ☐ Document everything with photos (take daily photos if possible)
  • ☐ Review any change orders carefully before signing
  • ☐ Keep all receipts, invoices, and correspondence organized

Inspection Points

  • ☐ Rough framing inspection
  • ☐ Rough plumbing inspection
  • ☐ Rough electrical inspection
  • ☐ Insulation inspection (if applicable)
  • ☐ Drywall/close-up inspection
  • ☐ Final inspection

Phase 4: Project Completion

Final Walkthrough Checklist

  • ☐ Walk every inch of the renovated space with your contractor
  • ☐ Test every outlet, switch, and fixture
  • ☐ Run all faucets — check for leaks under sinks
  • ☐ Flush toilets
  • ☐ Open and close all doors, drawers, and cabinets
  • ☐ Check all tile grout lines and caulking
  • ☐ Inspect paint and trim work in good lighting
  • ☐ Check flooring for any damage or imperfections
  • ☐ Verify all fixtures match your selections
  • ☐ Create a punch list of any items that need attention

After Completion

  • ☐ Obtain Certificate of Occupancy/Completion from the building department
  • ☐ Get all warranty documentation in writing
  • ☐ Collect manuals for any new appliances or systems
  • ☐ Update your homeowner’s insurance with the new home value
  • ☐ Save all project documentation for future reference and resale
  • ☐ Make final payment only after all punch list items are resolved
  • ☐ Leave a review for your contractor if they did great work

Rochester-Specific Renovation Tips

  • Older homes (pre-1978): Test for lead paint and asbestos before demolition. This is required by law in New York State for homes built before 1978.
  • Winter renovations: Interior renovations (kitchens, bathrooms, basements) are ideal during Rochester’s long winters. Exterior work is best scheduled May through October.
  • Historic districts: If your home is in a historic district (parts of Brighton, Pittsford Village), additional architectural review may be required.
  • Drainage: Rochester’s clay soil and high water table mean basement renovations need proper waterproofing and drainage solutions.
  • Energy efficiency: NYSERDA offers rebates and incentives for energy-efficient home improvements. Check nyserda.ny.gov before starting.

Need Help With Your Renovation?

TGM Contracting & Remodeling is an Owner-Operated general contractor serving the Rochester, NY suburbs. We handle everything on this checklist — from 3D design through final walkthrough — with a lifetime craftsmanship warranty on every project.

Call or text (585) 598-1003 to schedule a consultation.

Ready to Start Your Project?

Owner-Operated · Lifetime warranty on all craftsmanship

📞 (585) 598-1003

Request Your Consultation

Tell us about your project and we’ll be in touch to schedule your in-home consultation.

By submitting this form and providing your phone number, you agree that TGM may contact you by phone or text message about your inquiry, estimate, and project. Message frequency varies. Message and data rates may apply. Reply STOP to opt out or HELP for help. Consent is not a condition of purchase. See our Privacy Policy.


Ready to Start Your Project?

TGM Contracting & Remodeling — East Side, Wayne County & Oswego

KitchensBathroomsBasementsWhole Home
Start Your Design Process →

Discover more from TGM Contracting & Remodeling

Subscribe to get the latest posts sent to your email.

Leave a Reply

Your email address will not be published. Required fields are marked *